Abstract
Coastal Geologic Services, Inc. (CGS) has been contracted by Snohomish County Surface Water Management (County) to provide restoration feasibility assessments and proposed restoration designs of the shore at Kayak Point Regional Park. The project is comprised of two phases. The first phase was completed in late 2007 and entailed geomorphic assessments used to support the development of three conceptual beach and backshore restoration designs (Coastal Geologic Services Inc. 2007). A final design would be selected and completed to a 30% and 100% stage in Phase 2.
The purpose of this study was to provide a coastal geomorphic assessment and restoration feasibility study of the Kayak Point County Park for Snohomish County Surface Water Management.
Citation
MacLennan, A. (2007). Kayak Point County Park Restoration Feasibility Assessment Phase I. Coastal Geologic Services Inc. Retrieved from CAKE http://www.cakex.org/virtual-library/739